Amidst our efforts to unpack, I was finally able to compile all of my photos of our house progress. These are all from our first week in the house — starting September 24th — and it's weird to look back and think this was only a couple weeks ago. We got so far in such a short amount of time, thanks to 12-hour days and having lots of help from our families. 

Since we were having our hardwood floors refinished throughout the house, we were on a very tight timeline to get our projects done before the floor guy showed up. It was a crunch, but we accomplished all of our goals (and then some).

Here's everything we accomplished in the first week — I'll follow up with weeks 2 + 3 later, because it was just too much to show all at once. So, let's get to it!

This was the second floor hallway — the linen closet is behind those white doors, the master door is on the left and the guest room is across the hall, on the right. The door in the front right goes to the attic, and the third bedroom (which will be an office) is behind me to the left, at the top of the stairs.

The night we got our keys, we looked around, took some 'before' pictures, and got to work demolishing stuff. This is Jim ripping down the wall in the linen closet, which backed up into the master bedroom closet (below). Meanwhile, I got to work taking down the wallpaper.

The linen closet was very deep, and had some removable wire shelves in it — pretty makeshift. Our plan was to expand the master closet into that space, thus making the linen closet shallower. We also wanted to install some permanent wood shelves and replace the bi-fold door.

This was the master closet. It was actually pretty large, but the small door opening made it very difficult to access the space. This door fit the linen closet space, so we planned to use this door as the door for the linen closet (which would match the other original doors in the hallway) and install large bi-fold doors for this closet. We also removed the carpet so the hardwood floors could be redone. *I also just realized that "tah-tah!" should have been spelled with an 'h' but it's late, and you get the point.

Jim and his dad are cutting open the new door frame...as I stand and chew my nails.

I was a little scared when I saw this plaster disaster (hehe) but they knew what they were doing. Fun fact: did you know they used to mix horse hair in with the plaster in these old homes? It acted as a sort of "mesh" to hold the plaster together. I'm not sure how I like the thought of 90+ year old horse hair in my walls, so I'll just pretend I didn't hear that.

My mom, Jim's mom, and I handled the wallpaper, and it was a bitch. To make matters worse, we found a BONUS layer of wallpaper underneath! Oh joy. So we were at it for an entire day.

Hallway has been sanded, cleaned of old glue, and primed...

Here's the living room — the plaster ceiling had some damaged areas from previous problems that had been fixed, so that was at the top of our list.

These photos make it all look so easy, don't they? ;) Oh, and the walls have been painted! They look a little weird in the bad lighting, but they are Sherwin Williams Agreeable Gray. While the guys handled the construction work, I was on paint-till-I-drop duty. I actually enjoy painting, but this definitely tested me! Thankfully, everyone pitched in so we could stay on track.

Here's more closet progress...

Getting there! We are just waiting on the doors at this point — they were a special order —and we've just added some finishing details. And I am digging this wall color. Majorly. It's Sherwin Williams Gale Force.

That pretty much ends the projects from week one — the other two bedrooms and the hallways got painted but I'll be able to share those in my next post since they were a bit of a mess during all of this. Next up: floor sanding and moving in!